CURT 58445 Long-Lead Mini Fuse Bypass Switch for RV Dinghy Towing
This long-lead mini fuse bypass switch helps avoid having to remove and replace fuses when flat towing your vehicle. It is designed for vehicle-specific application and integrates with CURT RV harnesses for a custom-fit solution. It includes a bypass harness, fuse holder and other components.
  • Long-Lead Mini Fuse Bypass Switch
  • Helps avoid having to remove and replace fuses when flat towing your vehicle
  • Vehicle-specific application for a custom fit
  • Integrates with CURT RV harness (sold separately)
  • Includes bypass harness, fuse holder and other components
  • Fuse not included
  • 20-amp max
  • One-year warranty

Information:

Helps avoid having to remove and replace fuses when flat towing your vehicle

Application Summary:

Year Make/Model
2010-2011 Cadillac SRX
2008 Chevrolet Equinox
2014-2015 Chevrolet Malibu
2003 Chevrolet Tracker
2007-2020 Ford Edge
2001-2020 Ford Escape
2007-2011 Ford Explorer
2009-2019 Ford Flex
2006-2020 Ford Fusion
2003 GMC Safari
1997-2014 Honda CR-V
2009-2014 Honda Fit
2009-2012 Honda Pilot
1998 Jeep Wrangler
2009 Lexus RX350
2005 Pontiac G6
2007-2010 Pontiac G6
2007-2009 Saturn Aura
2008-2010 Saturn Vue
2008 Subaru Legacy
Attributes
California Proposition 65 WARNING: Cancer and Reproductive Harm - www.P65Warnings.ca.gov
Class ID 11, 11
Container Volume Cubic Feet - XA 0.00000
Container Volume Cubic Meter - XA 0.00000
Country of Origin (Primary) TW
Finish BLACK RUBBER
Finish - XA BLACK RUBBER, BLACK RUBBER
Harmonized Tariff Code (Schedule B) 8536509065
Hazardous Material Code N
Item Class - XA CME, CME
Item Height - XA 0.000, 0.000
Item Length - XA 0.000, 0.000
Item Width - XA 0.000, 0.000
Life Cycle Status Code Available to Order
Master Case Height Inches - XA 0.000, 0.000
Master Case Length Inches - XA 0.000, 0.000
Master Case Volume Cubic Feet - XA 0.00000, 0.00000
Master Case Weight Lbs - XA 0.000, 0.000
Master Case Width Inches - XA 0.000, 0.000
Material - XA THERMOPLASTIC RUBBER, THERMOPLASTIC RUBBER
Mount Type Description - XA Not Applicable, Not Applicable
NAFTA Preference Criterion Code B
Pallet Qty - XA 0.000, 0.000
Pallet Total Height Inches - XA 0.000, 0.000
Pallet Total Weight Per - XA 0.000, 0.000
Parcel Allowed - XA Yes, Yes
Price Code - XA E15, E15
Product Weight - XA 0.000, 0.000
Rate Class - XA 65.0, 70.0
Retail Height - XA 2.000, 2.000
Retail Length - XA 9.000, 9.000
Retail Width - XA 4.000, 4.000
Sales Family Code - XA ELECT, ELECT
Sales Family Description - XA ELECTRICAL COMPONENTS, ELECTRICAL COMPONENTS
Sales Group Description - XA RV HARNESS, RV HARNESS
SDR Required Flag N
Shipping Weight - XA 0.170, 1.000
Side Application Type Description - XA Not Applicable, Not Applicable
Tariff 301 - XA No, No
Truckload Volume Cubic Feet - XA 0.00000, 0.00000
Warranty One-Year Limited Warranty, One-Year Limited Warranty
GTIN 00612314584451